財經縱橫新浪首頁 > 財經縱橫 > 滾動新聞 > 部委專題--商務部 > 正文
 

中國寧波市水管理項目


http://whmsebhyy.com 2005年07月04日 18:10 商務部網站

  項目編號: GJZB_NO.4544項目名稱: 寧波市水管理項目國 家: 中國類 屬: 咨詢服務資金支持: 世界銀行摘要:咨詢服務貸款/信貸號碼:合同/投標號碼:發布日期: 2005-07-04截止日期:2005-07-11項目介紹:ThePeople抯 Republic of China has applied for aproject pretion grantfor the proposed GEF Ningbo-Cixi WetlandProject and intends toapply part of the grant proceeds to makepayments under thefollowing contracts:Contract 1: Ningbo-Cixiwetland project naturalwetland study. The tive of study is: (i)i
dentification of awetland conservation area west of theNingbo-Shanghai Bridge,including any necessary land improvements;(ii) conceptual designfor an Environmental Education and ResearchCenter in thedesignated wetland area, including cost estimates; and(iii)formulation of a TOR for a more comprehensiveenvironmentalmanagement plan study for the whole Cixi coastline tobe fundedunder the GEF projectContract 2: Ningbo-Cixi wetlandprojectconstructed wetland study. The tive of study is: the firstphase ofthe study will clearly define the tive of the constructedwetlandprogram and prepare alternative constructed wetland designswithoutconsidering land requirements. The second phase of the studywillconsider land-related issues and arrive at thepreferredconfiguration of wetland design and land use. The outputfrom thestudy will be a feasibility level study to enable theCixiMunicipal Wastewater Company and Cixi City Government toclearlydefine the detailed designs, construction andoperation/maintenancestages along with associated costs.The NingboWater and EnvironmentProject Management Office (NWEPMO) now invitesdomestic consultantsto indicate their interest in providing theservices. Interestedconsultants must provide detailed informationindicating that theyare qualified to perform the services,especially the experiencewith natural wetland and constructedwetland to treat effluentsfrom secondary biological treatmentplants or other wastewaters, aswell as experience in Hangzhou Bayfor Contract 1 (brochures,detion of similar assignments, experiencein similar conditions,availability of appropriate skills amongstaff, etc.).Consultantswill be selected in accordance with theprocedures set out in theWorld Bank抯 Guidelines: Selection andEmployment of Consultants byWorld Bank Borrower, May 2004, theselection will be based ontheConsultants?Qualification(CQS).Expected consultant assignmentswillstart from July 2005 and the duration is expected to beeightmonths.Interested consultants may obtain further informationat theaddress below from 0830 to 1130 hours and from 1400 to 1800hours,Monday to Friday.EOI should be received by NEWPMO at theaddressbelow not later than 1130 hours (Beijing time) on 11July2005.Contact:Ningbo Water and Environment ProjectManagementOffice.Attn: Ms. Xu Xu or Mr. Lizhibo.1510/R, 15/F,TianningTower.138 West Zhongshan Rd.Ningbo, 315000 ZhejiangProvince,China.Tel: (86-574) 8728-0409, 8718-6862.Fax:(86-574)8728-0430.E-mail: xx@nbdpc.gov.cn;mailto:zhibo@nbnet.com.cn.Website: http://xx@nbdpc.gov.cn;zhibo@nbnet.com.cnNoticeNumber:WB1925-658/05

 。ㄐ畔碓矗撼邪鼊趧疹l道子站)

  文章類型:



談股論金】【收藏此頁】【股票時時看】【 】【多種方式看新聞】【打印】【關閉
新 聞 查 詢
關鍵詞


新浪網財經縱橫網友意見留言板 電話:010-82628888-5174   歡迎批評指正

新浪簡介 | About Sina | 廣告服務 | 聯系我們 | 招聘信息 | 網站律師 | SINA English | 會員注冊 | 產品答疑

Copyright © 1996 - 2005 SINA Inc. All Rights Reserved

版權所有 新浪網

北京市通信公司提供網絡帶寬