項目編號: GJZB_NO.4172項目名稱: 電力傳輸項目國 家: 阿塞拜疆類 屬: 資源及能源貸款總額:(單位:百萬美元)發布日期: 2005-4-20 工程類別:進展階段:Appraisalcompleted.詳細介紹:Theproject aims at establishing an efficient andfinancially viablepower transmission system by creating a centraldispatch facilitywith energy management capability andrehabilitating the existingpower transmission grid. Appraisalcompleted. EnvironmentalAssessment Category: EnvironmentalAssessment Category B.
PID:83341. US$ 40.0 (IBRD). Consultants willbe required AzerenerjiJSC10, Academician Abdul Kerim Ali Zadeh st,Baku, AZ 1005,Azerbaijan. Contact: Mr. Teyyar Ibrahimov, ProjectDirector. Tel:(994-12) 984-184. Fax: (994-12) 985-523.E-mail:teyyar@azernerji.com
(信息來源:中國對外承包工程商會子站)
|